24/7 emergency intake · Toronto & GTA (647) 558-8439
Project case studies

Hotel and hospitality · Kingston, Ontario

74-room hotel renovation and conversion

A renovation proposal for 74 guestrooms across four levels, corridors, lobby and breakfast areas, with renderings of the proposed exterior and lobby finishes.

Documentation
Renovation proposal, architectural and interior drawings, and proposed-finish renderings
Proposed budget before HST
$1,910,401.00 CAD
Proposed hotel exterior with slate-blue facade panels, cedar-look siding and a covered drop-off
Exterior · Proposed finish visualization

Proposed exterior and lobby finishes

The renderings illustrate the proposed design based on the architectural and interior drawings.

Proposed hotel lobby with a white stone reception counter, wood slats and breakfast seating
Lobby and reception · Proposed finish visualization
Exterior and drop-off
Slate-blue EIFS panels, cedar-look metal siding at the entrance and dark metal trim around the covered drop-off.
Reception and breakfast areas
A white stone reception counter with wood slats and dark trim, warm neutral wallcovering and globe pendants. The layout connects the lobby to breakfast seating and a small market area.
Download the hotel case study (PDF)

Proposed scope

Guestrooms by type
The proposed work covered 74 rooms over four levels. Room types included king and double queen rooms, connecting rooms, suites and accessible accommodation. The scope included selective demolition, surface preparation, painting and flooring installation labour.
Corridors and public spaces
Corridor scope included flooring, wall preparation, painting and door finishes. The ground-floor proposal covered reception, breakfast seating, elevator lobbies, public circulation and supporting rooms.
Electrical and plumbing interfaces
The proposal identified lighting and controls, emergency and exit lighting, selected fixture reuse, shower and lavatory work, guest laundry and breakfast-area plumbing. Lobby work included HVAC adjustments where needed.
Exterior finish work
The proposed exterior scope included surface preparation, repainting and selected joint repairs.

Planning a similar project

Start with a room-type matrix and confirm which fixtures and finishes stay, which items the owner supplies, and how shutdowns and inspections affect each phase. Agree on guest access and the handover sequence with the operator.

Questions about the scope

How many rooms and floors were in the hotel scope?

The proposal covered 74 guestrooms across four levels. It listed corridors, ground-floor public areas, exterior work, electrical and plumbing as distinct work packages.

What should a hotel operator share to start a conversion or PIP review?

Share the room count and types, applicable brand standards or property improvement plan, current drawings, work windows, owner-supplied items and the desired room turnover sequence.

Plan work for your property

Tell MGL which spaces are involved and when the building can accommodate work.

Call MGLRequest assessment
MGL Property GuideGeneral information

Keep personal details and claim documents out of the guide. Call MGL for active property damage. Chats are stored for 30 days to respond and improve service.