24/7 emergency intake · Toronto & GTA (647) 558-8439
Project case studies

Condominium common areas

Completed condo corridor renovation

Matched site photos show corridor flooring preparation and the finished patterned carpet, including the transition from the tiled elevator landing.

Documentation
Progress and finished site photos
Finished condo corridor with patterned carpet continuing from a dark tiled elevator landing
Finished corridor viewed from the elevator landing

Progress and finished photos

Corridor flooring

Condo corridor during renovation with its floor exposed beneath decorative ceiling lights
During renovation · Exposed corridor floor
Comparable view of the finished corridor with patterned carpet and dark baseboards
Finished · Patterned carpet and baseboards

Elevator landing transition

Tiled elevator landing looking into the condo corridor during renovation
During renovation · Landing and corridor junction
Finished transition from the tiled landing to the corridor carpet
Finished · Tile-to-carpet transition

Renovation details

Floor preparation and carpet
The progress photos show the exposed corridor floor. The finished photos show patterned carpet running between the suite entrances.
Landing-to-corridor transition
The finished corridor carpet meets the dark tile at the elevator landing.
Suite entries and lighting
Finished views show dark door surrounds and baseboards against light walls, with decorative ceiling lights along the corridor.

Planning a similar project

Ask building management to confirm work windows, elevator access, resident notices and the sequence for moving between corridor sections. Review the carpet and tile transition with the flooring contractor before work starts.

Questions about the scope

What do the finished corridor photos show?

They show patterned carpet, dark suite-entry trim and baseboards, decorative lighting and the junction with the tiled elevator landing.

What should a condo board review when planning corridor work?

Review the flooring condition, transitions, wall and door finishes, resident access and building-approved work windows before setting the scope.

Plan work for your property

Tell MGL which spaces are involved and when the building can accommodate work.

Call MGLRequest assessment
MGL Property GuideGeneral information

Keep personal details and claim documents out of the guide. Call MGL for active property damage. Chats are stored for 30 days to respond and improve service.